Perfecting of technology of Foundation Construction in a Rammed Pit
- Authors: Kharun Makhmud M.I.1, Kvartenko KV.2
-
Affiliations:
- People's Friendship University of Russia
- Issue: No 3 (2012)
- Pages: 114-119
- Section: Articles
- URL: https://journals.rudn.ru/engineering-researches/article/view/5214
Cite item
Full Text
Abstract
Uniform and periodic covering of a surface rammer a layer of a lubricity liquid for reduction of friction of the soil and prevent soil from adhering to surface rammer produced by the spongy plate established in a cavity of the guide trunk and impregnated with lubricity liquid.
Keywords
About the authors
Makhmud Iskhakovich Kharun Makhmud
People's Friendship University of Russia
Email: miharun@mail.ru <mailto:miharun@mail.ru>
Кафедра проектирования и строительства гражданских,промышленных и специальных сооружений, конструкций и техникиИнженерный факультет; Российский университет дружбы народов; People's Friendship University of Russia