Medical organization management processes optimization through prototyping algorithms definition

Cover Page

Cite item

Full Text

Abstract

Relevance. In today’s competitive environment, project management can ensure higher speed and quality of achieving strategic goals set for the healthcare industry at minimal cost and risk. Due to the need to implement regional projects with higher speed and quality, the problems of algorithmization of project management processes become relevant. The aim of the study was to find a prototype model for managing the processes of a medical organization project, built on formalized data of the functional components of the project and algorithms obtained during stage-by-stage modeling of the system. Materials and Methods. The research materials included scientific developments, manuals and works of Russian and foreign authors devoted to the economic and mathematical model of decision support in organizations of various types, the adaptive abilities of medical organizations implementing national projects in healthcare. Results and Discussion. The complex multi-­level system of project implementation in the healthcare industry, the instability of the external environment and the diversity of stakeholder needs require finding an algorithm for the implementation of management processes. As part of the research question, in the process of constructing, formalizing the operation of the system, its elements, the presentation of data on the prototype of the medical organization project is iteratively refined — in accordance with the data, the algorithms are simultaneously refined. To build a model of a prototype of management processes in a medical organization in the region for the purpose of subsequent digitalization, it is necessary to formalize the variables, determine in accordance with the size of the range of values ​​that this variable can take, for subsequent effective algorithmization of management processes. The authors consistently correlated the stages of project management processes with the classification characteristics of models to establish the stages of their construction and modeling of the working model of the project prototype. Conclusion. Having established an optimal (effective) prototype of the project’s management processes, it can be immediately integrated into the project environment of a medical organization using machine learning methods.

Full Text

Fig. 1. Clarification of the fundamental structures of a medical organization within the framework of the influence of legislative restrictions ("zero approximation")

Fig. 2. Clarification of the management processes of the medical organization project within the framework of the influence of legislative restrictions ("first approximation")

Fig. 3. Finding the levels of detail for the project element(s) limited by a set of data related to the implementation of project tasks ("second approximation")

 

Table 1 
Finding a working prototype model based on correlation and analysis of the properties of management processes and algorithms within the framework of the implementation of the management stages of a regional medical organization project

 № 

п/п

 Этапы процессов управления проектом/ Stages of Project Management Processes

 Наименование символов/ Name of symbols

 Изображение символа/описание изображения символа/ Symbol image/symbol image description

 Управленческие процессы, с точки зрения отнесения классификации модели/ Management processes, from the point of view of classifying the model

 Основные этапы построения моделей/ Main stages of building models

 Рабочая модель прототипа проекта/ Working model of the project prototype

 

 1

 2

 3

 4

 5

 6

 1

 Целеполагание/ Goal setting

 Процесс/ Process

 Приближенное подобие модели объекта (стохастическая и динамическая)/ Approximate similarity of the object model (stochastic and dynamic)

 Содержательное описание моделируемого объекта/
Content description of the modeled objec
t

 …

 2

 Определение ситуации/ Definition­situations

 Принятие решений/ Making decisions

 Модель объекта является аналоговой (непрерывной) и реальной/ The object model is analog (continuous) and real

 Формализация операций/ Formalization of operations

 …

 3

 Выявление проблемы/ Identifying the problem

 Модификация/ Modification

 Наглядные модели объекта/ Visual object models

 Проверка адекватности модели/ Checking the adequacy of the model

 …

 4

 Управленческое решение/ Management decision

 Предопре­деленный процесс/ Predefined Process

 Гипотетическое моделирование объекта/ Hypothetical modeling of the object

 Корректировка модели/
Model adjustment

 …

 5

 Типы процессов управления/ Types of management processes

 Передача данных/
Data transfer

 Математическое моделирование объекта/ Mathematical modeling of the object

 Оптимизация модели/
Model optimization

 …

 

 

 Прерывание/ Interrupt

 

 

 

 

 

 Соединитель/ Connector

 

 

 

 6

 Системы (проблемная область)/ Systems (problem area)Объект моделирования/ Simulation objectЦелевое назначение моделей/ Purpose of modelsТребования к моделям/ Model requirementsФормы представления моделей/ Model representation formsВид описания моделей/ Model description typeХарактер реализации моделей/ The nature of the implementation of modelsМетод исследования/ Research method

 Комбинированное моделирование: Методы машинного обучения + Имитационное моделирование объекта/ Combined modeling: Machine learning methods + Object simulation

 Построение концептуальной модели системы и ее формализация/ Construction of a conceptual model of the system and its formalization; Алгоритмизация модели системы и ее машинная реализация/ Algorithmization of the system model and its machine implementation; Получение и интерпретация результатов моделирования системы/ Obtaining and interpreting system simulation results

 

Тable 2
Finding prototypes of management processes by comparing the requirements for the model of the processes of functioning of the project system and elements of the organizational structure of the project

 Функциональное наполнение формализованных процессов модели проекта/ Functional content of formalized processes of the project model

 Требования, предъявляемые к модели процессов функционирования системы проекта для создания его прототипа/ Requirements for the process model of the functioning of the project system for creating its prototype [10]

 Прототип/ Prototype

 Полнота модели/ Model completeness

 Гибкость модели/ Model flexibility

 Длитель­ность разработки/ Development duration

 Структура модели (блочность)/ Model structure (block structure)

 Информа­ционное обеспечение/ Information Support

 Экспери­мент с моделью/ Experiment with the model

 Первый этап проекта. Инициация/The first stage of the project. Initiation

 Разработка целей проекта, с помощью определения:/ Developing project goals by defining:

 элементы организационной структуры проекта:/ elements of the project organizational structure:

 операционное ядро организации/ operating core of the organization

 оценка процессов/process assessment

 оценка процессов/process assessment

 оценка процессов/process assessment

 оценка процессов/process assessment

 оценка процессов/process assessment

 оценка процессов/process assessment

 Содержательное описание моделируемого объекта/ Content description of the modeled object

 стратегическая вершина/ strategic pinnacle

 оценка процессов/process assessment

 оценка процессов/process assessment

 оценка процессов/process assessment

 оценка процессов/process assessment

 оценка процессов/process assessment

 оценка процессов/process assessment

 Содержательное описание моделируемого объекта/ Content description of the modeled object

 средняя линия/ middle line

 оценка процессов/process assessment

 оценка процессов/process assessment

 оценка процессов/process assessment

 оценка процессов/process assessment

 оценка процессов/process assessment

 оценка процессов/process assessment

 Содержательное описание моделируемого объекта/ Content description of the modeled object

 техноструктура/ technostructure

 оценка процессов/process assessment

 оценка процессов/process assessment

 оценка процессов/process assessment

 оценка процессов/process assessment

 оценка процессов/process assessment

 оценка процессов/process assessment

 Содержательное описание моделируемого объекта/ Content description of the modeled object

 вспомогательный персонал/ support staff

 оценка процессов/process assessment

 оценка процессов/process assessment

 оценка процессов/process assessment

 оценка процессов/process assessment

 оценка процессов/process assessment

 оценка процессов/process assessment

 Содержательное описание моделируемого объекта/ Content description of the modeled object

 идеология/ideology

 оценка процессов/process assessment

 оценка процессов/process assessment

 оценка процессов/process assessment

 оценка процессов/process assessment

 оценка процессов/process assessment

 оценка процессов/process assessment

 Содержательное описание моделируемого объекта/ Content description of the modeled object

 Критерии оценки/ Criteria for evaluation

 выявления скрытых взаимодействий, тестирования зависимостей, выявления слабых сторон, предупреждение случайностей/ identifying hidden interactions, testing dependencies, identifying weaknesses, preventing accidents

Fig.4. Conceptual filling with project processes in a medical organization, taking into account the properties of systematicity, elements of management activities in the unity of the goals of their functioning (feedback loops)

×

About the authors

Azis V. Akhokhova

Kabardino-Balkarian State University named after H.M. Berbekov; Limited liability company Firm «SEM»

Author for correspondence.
Email: Aza_stih@mail.ru
ORCID iD: 0000-0003-2370-9701
SPIN-code: 8076-6544
Nalchik, Russian Federation

Aksana M. Kardangusheva

Kabardino-Balkarian State University named after H.M. Berbekov

Email: Aza_stih@mail.ru
ORCID iD: 0000-0002-2960-7928
Nalchik, Russian Federation

Madina H. Tlakadugova

Kabardino-Balkarian State University named after H.M. Berbekov

Email: Aza_stih@mail.ru
ORCID iD: 0000-0003-1329-6085
Nalchik, Russian Federation

Liana T. Khokonova

Kabardino-Balkarian State University named after H.M. Berbekov

Email: Aza_stih@mail.ru
ORCID iD: 0009-0007-9687-0914
Nalchik, Russian Federation

Asiyat M. Gazaeva

Kabardino-Balkarian State University named after H.M. Berbekov

Email: Aza_stih@mail.ru
ORCID iD: 0009-0003-9211-8785
Nalchik, Russian Federation

Azamat A. Kardanov

Kabardino-Balkarian State University named after H.M. Berbekov

Email: Aza_stih@mail.ru
ORCID iD: 0009-0007-6024-7258
Nalchik, Russian Federation

Albina A. Pshukova

Kabardino-Balkarian State University named after H.M. Berbekov

Email: Aza_stih@mail.ru
ORCID iD: 0000-0002-0168-0429
Nalchik, Russian Federation

References

  1. Mussomeli A, Meeker B, Shepley S, Shatsky D. Expecting Digital Twins. Deloitte, 2018. URL: https://www2.deloitte.com/content/dam/insights/us/articles /3773_Expecting-­digital-twins/DI_Expecting-­digital-twins.pdf. (Accessed 10.05.2024).
  2. Petty K. Gartner Identifies Top 10 Strategic Technology Trends for 2018. URL: https://www.gartner.com/en/newsroom/press-­releases/2017-10-04 gartner-­identifies-the-top 10 strategic-­technology-trends-for 2018. (Accessed 10.05.2024).
  3. Baranova IV, Mayorov SV. Informatization of production activities as a tool for increasing the reliability of management decisions // Issues of innovative economics. 2018;8(1):15—24. doi: 10.18334/vinec.8.1.38909. (In Russian).
  4. Wirth N. Algorithms and data structures. New version for Oberon + CD // Transl. from English Tkachev F.V. M.: DMK Press, 2010. 272 p.
  5. Morozova IA, Glazova MV. Main types of management decisions and features of the process of their adoption // International scientific research journal. 2020;6(96):88—93. doi: 10.23670/IRJ.2020.96.6.129.6.
  6. Vinogradov GP. Algorithms for controlling processes in responsive sensor networks for object protection tasks // Software products and systems. 2022;35(2): 229—239. doi: 10.15827/0236-235X.138.229-239.7.
  7. Mintzberg G, Ahlstrand B, Lampel D. Schools of strategy. St. Petersburg: Peter. 2001; 253—280. (In Russian).
  8. Mintzberg G. Structure in the fist. St. Petersburg: Peter. 2002;29—45. (In Russian).
  9. Decree of the Government of the Russian Federation of December 26, 2017 N 1640 «On approval of the state program of the Russian Federation «Health Development». URL: https://base.garant.ru/71848440/. (In Russian).
  10. Belyaeva MA. Modeling of systems: lecture notes: 2 hours; part 1; Moscow state University of Printing named after Ivan Fedorov.: Moscow State Unitary Enterprise named after Ivan Fedorov, 2012. 188 p. (In Russian).
  11. Federal Law of November 21, 2011 N 323-FZ «On the fundamentals of protecting the health of citizens in the Russian Federation» URL: https://minzdrav.gov.ru/documents/7025 federalnyy-­zakon 323 fz-ot 21- noyabrya 2011 g. (In Russian).
  12. Order of the Ministry of Health of the Russian Federation dated May 10, 2017 N 203n «On approval of criteria for assessing the quality of medical care.» URL: https://www.garant.ru/products/ipo/prime/doc/71575880/ (In Russian).
  13. Akhokhova AV, Thabisimova IK, Thabisimova AB, Orakova FKh, Tlakadugova MKh, Anaeva LA, Shomakhova AM, Aibazova IN, Gadzaeva AA, Nakhusheva ZKh. Planning an experiment on a model of a medical organization implementing the regional project «Fighting Cardiovascular Diseases» to find an element of the optimal prototype. Healthcare manager. 2024;5:15—27. doi: 10.21045/
  14. 0185 2024 5 15 27. (In Russian).
  15. Passport of the national project «Healthcare» (approved by the Presidium of the Council under the President of the Russian Federation for Strategic Development and National Projects, protocol dated December 24, 2018 No. 16). URL: http://government.ru/info/35561/ (In Russian).
  16. Kobalava ZhD, Tolkacheva VV, Vatsik-Gorodetskaya MV, Cabello-Montoya FE, Nazarov IS, Galochkin SA. Implementation of a «seamless» model of providing specialized medical care to patients with heart failure. RUDN Journal of Medicine. 2023;27(2):141—154. doi: 10.22363/2313 0245 2023 27 2 141 154
  17. Agreement on the provision of subsidies from the federal budget to the republican budget of the Kabardino-­Balkarian Republic dated December 22, 2019 N 056 09 2020 265 (as amended by additional agreements dated March 1, 2022 N 056-09-2020-265/3 and from December 27, 2022 N 056-09-2020-265/4). URL: https://minfin.gov.ru/common/upload/library/2021/01/main/soglashenie_092-03-2021-002_ot_30.12.2020.pdf.17.
  18. Order of the Government of the Kabardino-­Balkarian Republic dated May 24, 2024 N 297 rp On approval of changes to the regional program «Combating cardiovascular diseases in the Kabardino-­Balkarian Republic», approved by order of the Government of the Kabardino-­Balkarian Republic dated May 31, 2021 N 219 rp. URL: https://base.garant.ru/407121204/
  19. Akhokhova AV, Thabisimova IK, Filipchenkov OV, Aptieva LR, Isaeva KA, Pshukov KR, Kesheva AK, Magomadova RB, Shiritova LA, Ozdamirova LR. Fundamental role of iterative processes in creating a working prototype in healthcare organizations implementing projects. Medical Technologies. Assessment and Choice. 2024;(2):6168. (In Russian).
  20. Akhokhova AV, Tkhabisimova IK, Tkhabisimova AB, Piakartova ZM. Functional modeling objects for creating a working project at the regional level // Quality Management in Medicine. 2024;(1):76—83. EDN NADTRO.
  21. Kostin AA, Abramov AYu, Tsvetkov AI, Kicha DI, Rukodaynyy OV, Goloshchapov-­Aksenov RS. Development and application experience of the clinical and organizational management algorithm for tuberculosis medical care at the regional level. RUDN Journal of Medicine. 2022;26(3):316—324. doi: 10.22363/2313 0245 2022 26 3 316 324
  22. Gerasimov K.B. Methodology of managing the operations of an organization: subprocesses, development // Bulletin of ChelSU. 2012;24(278):96—101. (In Russian).
  23. Kostin AA, Samsonov YV. Management structure and organization of oncological care. RUDN Journal of Medicine. 2024;28(2):206—215. doi: 10.22363/2313 0245 2024 28 2 206 215
  24. Tsiteladze DD. Algorithmization of project management processes. Scientific research and development // Russian Journal of Project Management. 2020;9(1):12—21. doi: 10.12737/
  25. 6279 2020 12 21.EDN DYXAGG.
  26. Mironova NN, Katasonov AN. Algorithmization of project management in domestic commercial and government organizations. NIB Bulletin. 2019;(37):170—174. (In Russian).
  27. Solokhina EYu, Titova EV. Algorithm for interaction between processes. Epoch of Science. 2017;(10):59—62. doi: 10.1555/2409 3203 2017 0 10 59 62
  28. Akhokhova AV, Thabisimova IK, Thabisimova AB, Kardanova LD, Anaeva LA, Shomakhova AM, Shomakhova ZD, Gadzaeva AA, Gyaurgieva MA. Search for an optimal model (prototype) intended for project management in medical organizations in the region. Healthcare manager. 2024;4:23—39. doi: 10.21045/1811 0185 2024 4 23 39 (In Russian).
  29. Thomson JJ. On the Structure of the Atom: an Investigation of the Stability and Periods of Oscillation of a number of Corpuscles arranged at equal intervals around the Circumference of a Circle; with Application of the Results to the Theory of Atomic Structure. Philosophical Magazine Series 6: journal. 1904;7(39):237. doi: 10.1080/14786440409463107

Supplementary files

Supplementary Files
Action
1. JATS XML
2. Fig. 1. Clarification of the fundamental structures of a medical organization within the framework of the influence of legislative restrictions ("zero approximation")

Download (106KB)
3. Fig. 2. Clarification of the management processes of the medical organization project within the framework of the influence of legislative restrictions ("first approximation")

Download (166KB)
4. Fig. 3. Finding the levels of detail for the project element(s) limited by a set of data related to the implementation of project tasks ("second approximation")

Download (150KB)
5. Fig.4. Conceptual filling with project processes in a medical organization, taking into account the properties of systematicity, elements of management activities in the unity of the goals of their functioning (feedback loops)

Download (100KB)

Copyright (c) 2025 Akhokhova A.V., Kardangusheva A.M., Tlakadugova M.H., Khokonova L.T., Gazaeva A.M., Kardanov A.A., Pshukova A.A.

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.