THE GENERALIZED CONSTRUCTIVE FORM OF TWO-PYLON CABLE-STAYED COMPOSITE BRIDGES AND THE FLOW-CHART OF PROGRAM OF THEIR DESIGN OPTIMIZATION

Cover Page

Abstract


This article presents the generalized constructive form of two-pylon cable-stayed composite bridges and the flow - chart of program of design optimization that provides the basis for developing the corresponding program of design optimization.
KEY WORDS: the two-pylon cable-stayed composite bridges, design optimization, flow - chart, generalized constructive form.

P M Salamahin

Email: pavel-salamahin@mail.ru

- Le Van Manh

Views

Abstract - 58

PDF (Russian) - 69


Copyright (c) 2016 Structural Mechanics of Engineering Constructions and Buildings